January 05, 2024
During pre Christmas Eve period work on construction sites is going at full pace.
Despite the hot pre-Christmas period, when everyone is thinking about Christmas Eve with their loved ones, work on construction sites is going at full pace.
On the Marymoncka Apartments investment - stage II, the painting of apartments and the installation of furniture, elevator and door portals have just been completed. The installation of stair and balcony balustrades and the installation of car platforms in the garage have been completed.
Marymoncka Apartments is an intimate, modern, 5-story building surrounded by natural green areas, developed by the developer WAN S.A.
The facility includes 48 apartments and 2 commercial premises with a total usable area of 3,155 m2.
Each future owner can choose from apartments with areas ranging from 28 to even 196 m2.
The undoubted advantage of the building at Marymoncka is its location on the map of Warsaw. The location will be convenient for both a first-year construction student or a person working in a dynamically developing corporation - the proximity of the Słodowiec metro station will certainly ensure this.
It is also worth mentioning the proximity to nature. In the immediate vicinity there is the Keller's Ponds Park, and about a 10-minute walk away is the Bielański Forest - a nature reserve with a total area of 130 hectares, which is connected to the Kampinos Forest through the Park and the Młociński Forest.